Teesside University BIOS Building

Systems Installed

  • Intruder Alarm
  • Structured Cabling
  • TV System
  • WC Alarms

Main Contractor
Wates Construction

M&E Contractor
SES Engineering

Sector
Education

Practical Completion
Ongoing

Whitley Bay High School

Systems Installed

  • Electrical (Sports Hall)
  • Intruder Alarm
  • Access Control
  • CCTV
  • Induction Loop
  • Structured Cabling

Main Contractor
BAM Construction

M&E Contractor
SES Engineering

Sector
Education

Practical Completion
Ongoing

South Tyneside Hospital IDC

Artists impression IDC.jpg

Systems Installed

  • Intruder Alarm
  • Access Control
  • Induction Loop
  • Structured Cabling

Main Contractor
Brims Construction

M&E Contractor
Emtec Building Services

Sector
Health

Practical Completion
March 2023

Home Group HQ - Newcastle - CAT B Fit Out

Systems Installed

  • Fire Detection & Alarm System
  • Security Systems

Main Contractor
Overbury

M&E Contractor
T Clark

Sector
Commercial

Practical Completion
January 2023

The Sands Leisure Centre - Carlisle

Systems Installed

  • Intruder Alarm
  • CCTV
  • Access Control
  • PA System
  • Nurse Call
  • Structured Cabling

Main Contractor
Wates Construction

M&E Contractor
SES Engineering Services

Sector
Leisure

Practical Completion
January 2023

Home Group HQ - Newcastle - CAT A Fit Out

Systems Installed

  • Electrical
  • Fire Detection & Alarm System
  • Disabled Refuge & WC Alarms
  • Intruder Alarm
  • CCTV
  • Access Control
  • Structured Cabling

Main Contractor
BAM Construction

M&E Contractor
SES Engineering Services

Sector
Commerical

Practical Completion
June 2022

Minsteracres Retreat

Systems Installed

  • Fire Detection & Alarm System
  • Access Control

Main Contractor
N/A

M&E Contractor
Swansons of Hexham

Sector
Conservation

Practical Completion
July 2022

Tombola - Wylam Wharf

Systems Installed

  • Fire Detection & Alarm System
  • Intruder Alarm
  • CCTV
  • Access Control
  • Structured Cabling

Main Contractor
Graeme Ash

M&E Contractor
Dougal & Railton

Sector
Commercial

Practical Completion
January 2022

University of York - Student Accommodation

Systems Installed

  • CAT6a Structured Cabling Network
  • Fibre Optic Backbone Cabling Network

 

Main Contractor
Graham Construction

M&E Contractor
SES Engineering Services

Sector
Residential

Practical Completion
January 2022

Lower Steenbergs Yard

Systems Installed

  • Fire Detection & Alarm System (Commercial)
  • UHF TV (Residential)
  • Telephone (Residential)

 

Main Contractor
Esh Group

M&E Contractor
John N Dunn Group

Sector
Commercial / Residential

Practical Completion
September 2021

Mustard Wharf - Leeds

Systems Installed

  • Fire Detection & Alarm System
  • WC Alarms
  • Structured Cabling
  • Access Control & Intercom
  • CCTV
  • Intruder Alarms (Retail Units)
  • Integrated Reception System

 

Main Contractor
Sir Robert McAlpine

M&E Contractor
SES Engineering Services

Sector
Residential

Practical Completion
July 2021

Marshgate Lane - London

Systems Installed

  • Fire Detection & Alarm System (Commercial & Residential)
  • Disabled Refuge & WC Alarms (Commercial)
  • Structured Cabling (Commercial)
  • Access Control & Intercom (Residential)
  • CCTV (Residential)
  • Integrated Reception System (Residential)

Main Contractor
Watkin Jones

M&E Contractor
Cogent Projects

Sector
Residential / Commercial

Practical Completion
July 2021

Backworth Dementia Care

Systems Installed

  • Induction Loops
  • Access Control
  • CCTV
  • Audio System
  • Integrated Reception System

 

Main Contractor
Brims Contruction

M&E Contractor
Dougal & Railton

Sector
Health Care

Practical Completion
June 2021

Five Towns Leisure - Pontefract

Systems Installed

  • Fire Detection & Alarm System
  • Disabled Refuge & WC Alarms
  • Pool Alarm
  • Induction Loops
  • Custom AV System
  • PA System
  • Intruder Alarm
  • CCTV
  • Structured Cabling
  • Integrated Reception System

Main Contractor
Willmott Dixon

M&E Contractor
Elm Building Services

Sector
Leisure

Practical Completion
January 2021

Ponteland Schools & Leisure Centre

Systems Installed

  • Fire Detection & Alarm System
  • Disabled Refuge & WC Alarms
  • PA System
  • Access Control
  • Intruder Alarm
  • CCTV
  • Integrated Reception System

Main Contractor
Kier

M&E Contractor
SES Engineering Services

Sector
Education / Leisure

Practical Completion
November 2020

Royal Shakespeare Company - Costume Workshop

Systems Installed

  • Fire Detection & Alarm System
  • Disabled Refuge
  • Structured Cabling
  • Access Control
  • Intruder Alarm

 

Main Contractor
Stepnell Construction

M&E Contractor
Cogent Projects

Sector
Commercial

Practical Completion
October 2020

Newcastle Energy Centre

Systems Installed

  • Fire Detection & Alarm System
  • Access Control
  • Intruder Alarm
  • CCTV
  • Structured cabling

 

Main Contractor
Engie

M&E Contractor
SES Engineering Services

Sector
Energy

Practical Completion
November 2019

Egham Orbit - Surrey

Systems Installed

  • Fire Detection & Alarm System
  • Intruder Alarm
  • CCTV
  • Structured cabling
  • PA System

 

Main Contractor
Pellikaan Construction

M&E Contractor
Elm Building Services

Sector
Leisure

Practical Completion
August 2019